Joseph S. Duffy, O'Duffy Home Remodeling and Handyman Service
In this kitchen remodel, the whole kitchen was gutted, a wall removed,
new electrical put in, new cabinets, new sink, new counters, etc.
The walls had to be mudded, then textured, primed, painted.
The tile on the floors had to be laid.
There is a lot of prep work before the counters can be put on.
Prepping and solidifying cabinets for counter surface.

We made the counters 2" taller by adding a frame
of
2 x 4's on top of the counters, topped with plywood.

The pony wall gets an overhang.

Then cement board in preparation for the granite tiles.

New tile for the floors.

New microwave and upper cabinets.

New sink!


My new granite counter tops going in!





Back to the Main
Page